After two weeks the bathroom is nearing completion. Main hardware is in and only the last bits of electrics and the grouting is outstanding. Then it's just left to me to programme the TV, bath and underfloor heating..oh, and paint the ceiling and remaining walls!
Saturday, June 25, 2011
Saturday, June 18, 2011
Bathroom TV Test
Thursday, June 16, 2011
Bathroom TV
Got talking to the builders last night about my TV dilemma and the hassle to fit it. They talked for a bit and then came up with a way to get it in the wall with less hassle than I expected - as such I'm going ahead with it and we'll have a nice little 19" telly in the bathroom ;) Made by Sonos, with sky digilink built in, floating waterproof remote and induction speakers!
Sunday, June 12, 2011
Yorkshire MBK
A few of us headed oop north this weekend for some proper mountain biking. The weather held for the most part and we had some fantastic rides (including a 7km downhill!). Was happy to get out of the Landrover though after 4.5 hours in the back with all the bags!
Labels: bike
Sunday, June 05, 2011
Bathroom ordered...
After an expensive week we have now finally gotten all the various parts ordered for our new bathroom - work starts next week! We've gone for Aqualisa HiQu shower and Bath (with a computer controller for each), an IKEA double sink unit, grey tiling and underfloor heating - oh, and the coolest towel radiator we could find! The funky mosaic tiles to the left are going as a splash-back behind the sinks...
Labels: House